For your attention, a video report on construction for November 2022.
As of December 3, 2022:
The entrance to the facility is asphalted.
5 foundation slabs have been formed.
Columns and walls of the first floor of the parking lot have been formed.
Preparatory work formed on the sixth (last) foundation slab has begun.
Preparatory work is being carried out for the pouring of the floor slab of the first floor, slabs No. 6 and No. 5